Projects
1. AL-Ramady sewage project
- cost: 131,068,000,000
- Beneficiaries: AL-Anbar
2. Mosul waste water treatment plant – left side
- cost: 96,000,000,000
- Beneficiaries: Nenwa
3. Baquba networks, pump stations project
- cost: 14,827,310,000
- Beneficiaries: Diyala
4. AL-Rasheed treatment plant ,and pump stations project
- cost: 14,600,000,000
- Beneficiaries: Baghdad
5. Construct networks and connections in ALmoualmeen district in AL-Swerah
- cost: 877,750,000
- Beneficiaries: Wassit
6. AL-Ramady sewage project
- cost: 24,572,490,000
- Beneficiaries: AL-Qadsyah
7. Construct the main drinkable water line and develop ALhafryah district project
- cost: 133,830,000
- Beneficiaries: Wassit
8. Construct apartments for doctors in Ibn ALBalady hospital
- cost: 1,2490,000,000
- Beneficiaries: Baghdad
9. Construct dental care center in ALSadir town
- cost: 2,565,624,000
- Beneficiaries: Baghdad
10. Built municipality building in ALwihda district
- cost: 478,230,000
- Beneficiaries: Baghdad
11. Paving by a layer of subbase in western side in AL-Nahrawan
- cost: 93,400,000
- Beneficiaries: Baghdad
12. Paving by a layer of subbase in eastern side in AL-Nahrawan
- cost: 98,280,000
- Beneficiaries: Baghdad
13. Rebuilt ALNassiryah river side from ALnasir bridge to AL-Zaytoon bridge.
- cost: 343,642,000
- Beneficiaries: Thi-Qar
14. Rebuilt ALNassiryah river side from ALnasir bridge
- cost: 48,261,000
- Beneficiaries: Thi-Qar
15. Construct green zone gardens
- cost: 1,514,646,000
- Beneficiaries: Thi-Qar
16. Rebuilt ALNassiryah river side to ALSHmiyah
- cost: 1,443,315,000
- Beneficiaries: Thi-Qar
17. Wrapped by stone the river bank from ALnasir bridge to AL-Zaytoon
- cost: 123,000,000
- Beneficiaries: Thi-Qar
18. Construct ALI AL-Akbar school in ALHafryah
- cost: 277,200,000
- Beneficiaries: Wassit